Restoration-first commercial roofing across Western Pennsylvania · Call 814-720-1081
Home / Industrial Roofing
Large-area roofs over plants, warehouses and production floors, restored or replaced without stopping a running facility, and sequenced around your shifts rather than ours.
Certified To Install
It gets patched, it holds through one dry spell, and it is back the next time the wind drives rain the wrong way.
We find where the water actually gets in before anyone quotes you a system.
A full tear-off was quoted on a roof that may not need one, and nobody showed you the condition of the deck.
We say so when a roof does not need replacing, even though replacing it pays us more.
Mil thickness, ponding ratios, a system name you were told to trust. You are responsible for the building and cannot check a word of it.
Nothing happens on your roof without you knowing first. That is the rule here, not a slogan.
That is the one that costs the most and it is the reason this company exists. The contractor who came in sixty thousand dollars cheaper than us on a roof nearby is no longer trading. We are the ones installing the replacement.
Ask us who services your roof in year three. It is the only question on this page we can answer with a name.
On a plant or a warehouse the roof is rarely the expensive part of a roof project. The expensive part is what happens to production while the work is going on.
Restoration removes that problem. Nothing is torn off, the deck is never open, and crews work above a building that carries on running underneath them.
Units, curbs, ducts, conduit and walkway pads all move independently of the roof and all penetrate it. That is where the water gets in, and that is where the work concentrates.
Each one is sealed and fabric-reinforced before the field is coated, so the finished roof is one continuous surface with the vulnerable points already handled.
On a plant or a distribution building, an hour of downtime costs more than the roof work does. Restoration means no tear-off, no open deck and no reason to halt the line.
The bigger the roof, the bigger the gap between restoring and replacing. On industrial square footage, 50 to 70 percent less is a capital decision, not a maintenance one.
Units, curbs, ducts, conduit and walkways are where an industrial roof leaks. Those details get sealed and reinforced individually, because that is the actual job.
Large roofs get walked and scanned in sections, with the equipment, penetrations and drainage mapped, because on this square footage guessing is expensive.
Staging, access routes, lift placement and which sections get worked when are agreed with your team before anything starts.
Curbs, units, ducts and conduit penetrations are sealed and fabric-reinforced before the field is touched. This is where industrial roofs leak.
The field is coated seamlessly, registered for a manufacturer warranty of up to 20 years, and handed over with a photographed record of every detail.
Straight answers on cost, timeline, and what a restoration actually involves. No jargon, no sales pressure.
A free, photo-documented assessment and honest numbers on restore versus replace.
Yes, and it is most of what industrial work involves. There is no tear-off in a restoration, so the deck is never open and nothing rains into the space below. Sections are sequenced around your shifts.
Usually yes, and the equipment is the reason it works well. Every curb, unit and penetration is sealed and reinforced individually, which is exactly where these roofs leak. A tear-off has to disconnect and reset that equipment. A restoration does not.
In sections, with a survey and moisture scan mapped across the whole area first. Large roofs are rarely in one condition throughout, and treating them as one number is how owners get quoted a full replacement for a roof that needs work on a third of it.
The same manufacturer warranties apply, up to 20 years, honored the full term. Registration and the documented detail work are what keep them enforceable, and both come as part of the job.
Yes. You get the photographs, the moisture survey and the scope in writing, which is what a maintenance manager needs to get a capital request approved rather than argued about.
Request your free, photo-documented roof assessment. Honest options, firm numbers, and a roofer who will still be here next year.
Free assessment · Photo-documented · No obligation, no pressure